← Tamil Nadu

Reservoir · Tamil Nadu · India · Tamil Nadu WRD

Thumbalahalli

8.6% of gross capacity

Gross capacity

0.14 TMC (4 MCM)

Live capacity

0.11 TMC (3 MCM)

River

Poolapatti

Basin

Pennaiyar

Primary use

irrigation

Reported

November 5, 2026

Capacity in TMC

Thumbalahalli Dam has a gross capacity of 0.14 TMC (4 MCM), of which 0.11 TMC (3 MCM) is live storage; it is currently at 8.6% full, holding 0.00 TMC (0 MCM).

Gross capacity
0.14 TMC (4 MCM)
Live capacity
0.11 TMC (3 MCM)
Current storage
0.00 TMC (0 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from Tamil Nadu WRD, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

8.6%
Critical

vs 28 Oct 2026

-0.1 pp

losing

vs 1 year ago

N/A

Trend

→

stable

Drought context

India drought →

Rainfall, last 3 months

Near normal

SPI-3 −0.59 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: Tamil Nadu WRD.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 12.303°N, 78.156°E · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Thumbalahalli

As of November 5, 2026, Thumbalahalli has a published fill of 8.6%, holding 0.00 TMC (0 MCM). Gross capacity is 0.14 TMC (4 MCM). At this level the reservoir is critically low. Of that total, 0.11 TMC (3 MCM) is live storage.

Since October 28, 2026 the fill level has held broadly steady (-0.1 pp).

Across the readings we hold for Thumbalahalli — 6 data points between June 26, 2026 and November 5, 2026 — the level has ranged from a low of 8.6% (November 5, 2026) to a high of 18.9% (June 26, 2026).

It is operated by Tamil Nadu Water Resources Dept primarily for irrigation. It lies within the Pennaiyar basin at 12.303°N, 78.156°E.

Key facts

Current fill level
8.6%
Water stored
0.00 TMC (0 MCM)
Total capacity
0.14 TMC (4 MCM)
Usable capacity
0.11 TMC (3 MCM)
Change since October 28, 2026
▼ 0.1 pp
Primary use
Irrigation
River
Poolapatti
River basin
Pennaiyar
Operator
Tamil Nadu Water Resources Dept
Coordinates
12.303°N, 78.156°E
Last updated
November 5, 2026

Recent readings

DateFill levelVolume (hm³)
5 Nov 20268.6%0
28 Oct 20268.6%0
30 Aug 202612.3%0
22 Aug 202612.8%0
14 Aug 202613.3%0
26 Jun 202618.9%1

Nearby reservoirs