Reservoir · Maharashtra · India · CWC · WESTERN region
Pench (Totladoh)
Pench Project (Totladoh Dam)
93.2% full
Gross capacity
29.2 TMC (828 MCM)
Live capacity
24.8 TMC (703 MCM)
River
Pench
Basin
Godavari
Primary use
multiple
Reported
October 29, 2026
Capacity in TMC
Pench (Totladoh) Dam has a gross capacity of 29.2 TMC (828 MCM), of which 24.8 TMC (703 MCM) is live storage; it is currently at 93.2% full, holding 35.9 TMC (1,017 MCM).
- Gross capacity
- 29.2 TMC (828 MCM)
- Live capacity
- 24.8 TMC (703 MCM)
- Current storage
- 35.9 TMC (1,017 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
93.2%vs 7 days ago
0.0 ppstable
vs 1 year ago
+5.7 ppyear-over-year
7-day trend
→stable
Drought context
India drought →Storage vs October average
101%of normal
93.2% now · 92.0% average (4 yrs)
Rainfall, last 3 months
Moderately dry
SPI-3 −1.23 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 29 Oct 2026 | 93.2% | 1,017 |
| 22 Oct 2026 | 93.2% | 1,017 |
| 15 Oct 2026 | 93.2% | 1,017 |
| 8 Oct 2026 | 93.2% | 1,017 |
| 1 Oct 2026 | 93.2% | 1,017 |
| 24 Sep 2026 | 93.2% | 1,017 |
| 17 Sep 2026 | 93.2% | 1,017 |
| 10 Sep 2026 | 93.2% | 1,017 |
| 3 Sep 2026 | 93.2% | 1,017 |
| 27 Aug 2026 | 93.2% | 1,017 |
| 20 Aug 2026 | 93.2% | 1,017 |
| 13 Aug 2026 | 93.2% | 1,017 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | MAHAGENCO |
| Coordinates | 21.597°N, 79.239°E |
About this reservoir
Data source
official
Storage data: CWC. CWC region: WESTERN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 21.597°N, 79.239°E · Open in Google Maps
About Pench Project (Totladoh Dam)
As of October 29, 2026, Pench Project (Totladoh Dam) has a published fill of 93.2%, holding 35.9 TMC (1,017 MCM). Gross capacity is 29.2 TMC (828 MCM). At this level the reservoir is high. Of that total, 24.8 TMC (703 MCM) is live storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pp), and it is 5.7 points above its level on the same date a year earlier.
Across the readings we hold for Pench Project (Totladoh Dam) — 171 data points between June 7, 2023 and October 29, 2026 — the level has ranged from a low of 46.0% (June 13, 2024) to a high of 93.2% (September 25, 2025). On average the reservoir is fullest around October and at its lowest around June.
It is operated by MAHAGENCO primarily for multiple purposes. It lies within the Godavari basin at 21.597°N, 79.239°E.

