Madduvalasa Project Dam has a gross capacity of 3.4 TMC (95.513 MCM), of which 3.3 TMC (93.53 MCM) is live storage; it is currently at 86.8% of gross capacity, holding 2.9 TMC (82.94 MCM) (88.7% of live capacity).

Gross capacity
3.4 TMC (95.513 MCM)
Live capacity
3.3 TMC (93.53 MCM)
Current storage
2.9 TMC (82.94 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

86.8%
High

vs 7 days ago

+10.6 pp

gaining

vs 1 year ago

N/A

7-day trend

↑

rising

Drought context

India drought →

Rainfall, last 3 months

Near normal

SPI-3 +0.66 · to 11 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 18.587°N, 83.620°E · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Madduvalasa Project

As of November 5, 2026, Madduvalasa Project is filled to 86.8% of its gross capacity, holding 2.9 TMC (82.94 MCM) of a gross 3.4 TMC (95.513 MCM). At this level the reservoir is high. Of that total, 3.3 TMC (93.53 MCM) is live storage.

Over the most recent week on record the fill level has risen by 10.6 percentage points.

Across the readings we hold for Madduvalasa Project — 19 data points between July 2, 2026 and November 5, 2026 — the level has ranged from a low of 26.2% (August 20, 2026) to a high of 88.9% (November 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 18.587°N, 83.620°E.

Key facts

Current fill level
86.8% of total capacity
Water stored
2.9 TMC (82.94 MCM)
Total capacity
3.4 TMC (95.513 MCM)
Usable capacity
3.3 TMC (93.53 MCM)
7-day change
▲ 10.6 pp
River basin
Other
Operator
AP Water Resources Dept
Coordinates
18.587°N, 83.620°E
Last updated
November 5, 2026

Recent readings

DateFill levelVolume (hm³)
5 Nov 202686.8%82.94
4 Nov 202687.7%83.789
3 Nov 202683.0%79.23
2 Nov 202688.9%84.922
29 Oct 202676.2%72.774
28 Oct 202639.1%37.35
27 Oct 202652.9%51
22 Oct 202681.9%78
16 Sep 202642.2%40
9 Sep 202629.7%28
2 Sep 202631.9%30
27 Aug 202632.1%31