← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Madduvalasa Project

52.9% of gross capacity

Gross capacity

3.4 TMC (96 MCM)

Live capacity

3.3 TMC (94 MCM)

Basin

Other

Operator

AP Water Resources Dept

Coordinates

18.587°N, 83.620°E

Last updated

2026-10-27

Capacity in TMC

Madduvalasa Project Dam has a gross capacity of 3.4 TMC (96 MCM), of which 3.3 TMC (94 MCM) is live storage; it is currently at 52.9% of gross capacity, holding 1.8 TMC (51 MCM) (54.3% of live capacity).

Gross capacity
3.4 TMC (96 MCM)
Live capacity
3.3 TMC (94 MCM)
Current storage
1.8 TMC (51 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

52.9%
Normal

vs 22 Oct 2026

-29.0 pp

losing

vs 1 year ago

N/A

Trend

↓

falling

Drought context

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Madduvalasa Project had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +0.66). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 18.587°N, 83.620°E · Open in Google Maps

About Madduvalasa Project

As of October 27, 2026, Madduvalasa Project is filled to 52.9% of its gross capacity, holding 1.8 TMC (51 MCM) of a gross 3.4 TMC (96 MCM). At this level the reservoir is within its normal operating range. Of that total, 3.3 TMC (94 MCM) is live storage.

Since October 22, 2026 the fill level has fallen by 29.0 percentage points.

Across the readings we hold for Madduvalasa Project — 13 data points between July 2, 2026 and October 27, 2026 — the level has ranged from a low of 26.2% (August 20, 2026) to a high of 81.9% (October 22, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 18.587°N, 83.620°E.

Key facts

Current fill level
52.9% of total capacity
Water stored
1.8 TMC (51 MCM)
Total capacity
3.4 TMC (96 MCM)
Usable capacity
3.3 TMC (94 MCM)
Change since October 22, 2026
▼ 29.0 pp
River basin
Other
Operator
AP Water Resources Dept
Coordinates
18.587°N, 83.620°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202652.9%51
22 Oct 202681.9%78
16 Sep 202642.2%40
9 Sep 202629.7%28
2 Sep 202631.9%30
27 Aug 202632.1%31
20 Aug 202626.2%25
13 Aug 202627.2%26
4 Aug 202630.5%29
29 Jul 202634.8%33
22 Jul 202638.3%37
15 Jul 202638.3%37