86.4% full

Gross capacity

0.49 TMC (14 MCM)

Live capacity

0.42 TMC (12 MCM)

Basin

Other

Operator

AP Water Resources Dept

Coordinates

17.486°N, 82.012°E

Last updated

2026-10-11

Capacity in TMC

Maddigedda Project Dam has a gross capacity of 0.49 TMC (14 MCM), of which 0.42 TMC (12 MCM) is live storage; it is currently at 86% full, holding 0.42 TMC (12 MCM).

Gross capacity
0.49 TMC (14 MCM)
Live capacity
0.42 TMC (12 MCM)
Current storage
0.42 TMC (12 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

86.4%
High

vs 7 days ago

0.0%

stable

vs 1 year ago

N/A

7-day trend

→

stable

Drought context

Rain over the last three months · 21 September 2026

Near normal

In the three months to 21 September 2026 the area around Maddigedda Project had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.63). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 17.486, 82.012 · Open in Google Maps

About Maddigedda Project

As of October 11, 2026, Maddigedda Project is filled to 86.4% of its total capacity, holding 0.42 TMC (12 MCM) of a gross 0.49 TMC (14 MCM). At this level the reservoir is high. Of that total, 0.42 TMC (12 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts).

Across the readings we hold for Maddigedda Project — 1 data points between October 11, 2026 and October 11, 2026 — the level has ranged from a low of 86.4% (October 11, 2026) to a high of 86.4% (October 11, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 17.486°N, 82.012°E.

Key facts

Current fill level
86.4%
Water stored
0.42 TMC (12 MCM)
Total capacity
0.49 TMC (14 MCM)
Usable capacity
0.42 TMC (12 MCM)
7-day change
No change
River basin
Other
Operator
AP Water Resources Dept
Coordinates
17.486°N, 82.012°E
Last updated
October 11, 2026

Recent readings

DateFill levelVolume (hm³)
11 Oct 202686.4%12

Nearby reservoirs

ShareXLinkedInWhatsApp