Reservoir · Odisha · India · CWC · EASTERN region
Machkund
96.9% of gross capacity
Gross capacity
31.5 TMC (893 MCM)
Live capacity
31.5 TMC (893 MCM)
Primary use
multiple
Reported
October 29, 2026
Capacity in TMC
Machkund Dam has a gross capacity of 31.5 TMC (893 MCM); it is currently at 96.9% of gross capacity, holding 30.6 TMC (866 MCM).
- Gross capacity
- 31.5 TMC (893 MCM)
- Live capacity
- 31.5 TMC (893 MCM)
- Current storage
- 30.6 TMC (866 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
96.9%vs 7 days ago
Stale7-day trend
StaleDrought context
India drought →Storage vs October average
103%of normal
96.9% now · 94.0% average (2 yrs)
Rainfall, last 3 months
Very wet
SPI-3 +1.68 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 29 Oct 2026 | 96.9% | 866 |
| 22 Oct 2026 | 90.8% | 811 |
| 15 Oct 2026 | 90.2% | 806 |
| 8 Oct 2026 | 90.8% | 811 |
| 1 Oct 2026 | 91.1% | 813 |
| 24 Sep 2026 | 70.0% | 625 |
| 17 Sep 2026 | 61.1% | 546 |
| 10 Sep 2026 | 54.9% | 490 |
| 3 Sep 2026 | 53.3% | 476 |
| 27 Aug 2026 | 49.2% | 439 |
| 20 Aug 2026 | 41.4% | 370 |
| 13 Aug 2026 | 37.1% | 331 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | CWC |
| Coordinates | 18.453°N, 82.547°E |
About this reservoir
Data source
official
Storage data: CWC. CWC region: EASTERN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 18.453°N, 82.547°E · Open in Google Maps
About Machkund
As of October 29, 2026, Machkund is filled to 96.9% of its gross capacity, holding 30.6 TMC (866 MCM) of a gross 31.5 TMC (893 MCM). The reading is past the freshness window, so it is shown as stale.
The 7-day change is not shown, because the latest reading is past the freshness window.
Across the readings we hold for Machkund — 78 data points between April 3, 2025 and October 29, 2026 — the level has ranged from a low of 17.0% (May 29, 2026) to a high of 96.9% (October 29, 2026). On average the reservoir is fullest around November and at its lowest around June.
It is operated by CWC primarily for multiple purposes. It is at 18.453°N, 82.547°E.