← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Krishnapuram Project

2.0% of gross capacity

Gross capacity

0.20 TMC (5.663 MCM)

Live capacity

0.18 TMC (5.097 MCM)

Basin

Other

Reported

November 16, 2026

Capacity in TMC

Krishnapuram Project Dam has a gross capacity of 0.20 TMC (5.663 MCM), of which 0.18 TMC (5.097 MCM) is live storage; it is currently at 2% of gross capacity, holding 0.00 TMC (0.113 MCM) (2.2% of live capacity).

Gross capacity
0.20 TMC (5.663 MCM)
Live capacity
0.18 TMC (5.097 MCM)
Current storage
0.00 TMC (0.113 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

2.0%
Critical

vs 10 Nov 2026

0.0 pp

stable

vs 1 year ago

N/A

Trend

→

stable

Drought context

India drought →

Rainfall, last 3 months

Moderately dry

SPI-3 −1.41 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
16 Nov 20262.0%0.113
13 Nov 20262.0%0.113
12 Nov 20262.0%0.113
11 Nov 20262.0%0.113
10 Nov 20262.0%0.113
5 Nov 20262.0%0.113
4 Nov 20262.0%0.113
2 Nov 20262.0%0.113
28 Oct 20262.0%0.113
27 Oct 20262.0%0
22 Oct 20262.0%0
16 Sep 20262.0%0

Weekly storage

Fill history — multi-year

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorAP Water Resources Dept
Coordinates13.369°N, 79.353°E

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 13.369°N, 79.353°E · Open in Google Maps

About Krishnapuram Project

As of November 16, 2026, Krishnapuram Project is filled to 2.0% of its gross capacity, holding 0.00 TMC (0.113 MCM) of a gross 0.20 TMC (5.663 MCM). At this level the reservoir is critically low. Of that total, 0.18 TMC (5.097 MCM) is live storage.

Since November 10, 2026 the fill level has held broadly steady (+0.0 pp).

Across the readings we hold for Krishnapuram Project — 22 data points between July 2, 2026 and November 16, 2026 — the level has ranged from a low of 2.0% (July 29, 2026) to a high of 2.5% (July 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 13.369°N, 79.353°E.

Nearby reservoirs