Reservoir · Andhra Pradesh · India · AP-WRIMS
Krishnapuram Project
2.0% of gross capacity
Gross capacity
0.20 TMC (5.663 MCM)
Live capacity
0.18 TMC (5.097 MCM)
Basin
Other
Reported
November 16, 2026
Capacity in TMC
Krishnapuram Project Dam has a gross capacity of 0.20 TMC (5.663 MCM), of which 0.18 TMC (5.097 MCM) is live storage; it is currently at 2% of gross capacity, holding 0.00 TMC (0.113 MCM) (2.2% of live capacity).
- Gross capacity
- 0.20 TMC (5.663 MCM)
- Live capacity
- 0.18 TMC (5.097 MCM)
- Current storage
- 0.00 TMC (0.113 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
2.0%vs 10 Nov 2026
0.0 ppstable
vs 1 year ago
N/ATrend
→stable
Drought context
India drought →Rainfall, last 3 months
Moderately dry
SPI-3 −1.41 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 16 Nov 2026 | 2.0% | 0.113 |
| 13 Nov 2026 | 2.0% | 0.113 |
| 12 Nov 2026 | 2.0% | 0.113 |
| 11 Nov 2026 | 2.0% | 0.113 |
| 10 Nov 2026 | 2.0% | 0.113 |
| 5 Nov 2026 | 2.0% | 0.113 |
| 4 Nov 2026 | 2.0% | 0.113 |
| 2 Nov 2026 | 2.0% | 0.113 |
| 28 Oct 2026 | 2.0% | 0.113 |
| 27 Oct 2026 | 2.0% | 0 |
| 22 Oct 2026 | 2.0% | 0 |
| 16 Sep 2026 | 2.0% | 0 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | AP Water Resources Dept |
| Coordinates | 13.369°N, 79.353°E |
About this reservoir
Data source
official
Storage data: AP-WRIMS.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 13.369°N, 79.353°E · Open in Google Maps
About Krishnapuram Project
As of November 16, 2026, Krishnapuram Project is filled to 2.0% of its gross capacity, holding 0.00 TMC (0.113 MCM) of a gross 0.20 TMC (5.663 MCM). At this level the reservoir is critically low. Of that total, 0.18 TMC (5.097 MCM) is live storage.
Since November 10, 2026 the fill level has held broadly steady (+0.0 pp).
Across the readings we hold for Krishnapuram Project — 22 data points between July 2, 2026 and November 16, 2026 — the level has ranged from a low of 2.0% (July 29, 2026) to a high of 2.5% (July 2, 2026).
It is operated by AP Water Resources Dept. It lies within the Other basin at 13.369°N, 79.353°E.

