Reservoir · Madhya Pradesh · India · CWC · CENTRAL region
Indira Sagar
Indira Sagar Dam
86.9% of live capacity
Gross capacity
431.6 TMC (12,221 MCM)
Live capacity
344.2 TMC (9,748 MCM)
Basin
Narmada
Primary use
multiple
Reported
October 29, 2026
Capacity in TMC
Indira Sagar has a gross capacity of 431.6 TMC (12,221 MCM), of which 344.2 TMC (9,748 MCM) is live storage; it is currently at 86.9% of live capacity, holding 298.9 TMC (8,465 MCM).
- Gross capacity
- 431.6 TMC (12,221 MCM)
- Live capacity
- 344.2 TMC (9,748 MCM)
- Current storage
- 298.9 TMC (8,465 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
86.9%vs 7 days ago
-1.4 pplosing
vs 1 year ago
-7.3 ppyear-over-year
7-day trend
↓falling
Drought context
India drought →Storage vs October average
93%of normal
86.9% now · 93.0% average (4 yrs)
Rainfall, last 3 months
Moderately dry
SPI-3 −1.06 · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC. CWC region: CENTRAL.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 22.267°N, 76.458°E · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Indira Sagar Dam
As of October 29, 2026, Indira Sagar Dam is at 86.9% of useful capacity, holding 298.9 TMC (8,465 MCM) of 344.2 TMC (9,748 MCM). Of the gross 431.6 TMC (12,221 MCM), that is 69.3%. At this level the reservoir is high.
Over the most recent week on record the fill level has fallen by 1.4 percentage points, and it is 7.3 points below its level on the same date a year earlier.
Across the readings we hold for Indira Sagar Dam — 171 data points between June 8, 2023 and October 29, 2026 — the level has ranged from a low of 2.7% (March 27, 2026) to a high of 99.0% (November 2, 2023). On average the reservoir is fullest around November and at its lowest around June.
It is operated by NHPC primarily for multiple purposes. It lies within the Narmada basin at 22.267°N, 76.458°E.
Key facts
- Current fill level
- 86.9% of useful capacity
- Water stored
- 298.9 TMC (8,465 MCM)
- Total capacity
- 431.6 TMC (12,221 MCM)
- Usable capacity
- 344.2 TMC (9,748 MCM)
- 7-day change
- ▼ 1.4 pp
- Year-on-year
- ▼ 7.3 pp
- Primary use
- Multipurpose
- River basin
- Narmada
- Operator
- NHPC
- Coordinates
- 22.267°N, 76.458°E
- Last updated
- October 29, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 29 Oct 2026 | 86.9% | 8,465 |
| 22 Oct 2026 | 88.3% | 8,600 |
| 15 Oct 2026 | 90.3% | 8,798 |
| 8 Oct 2026 | 92.9% | 9,050 |
| 1 Oct 2026 | 94.2% | 9,179 |
| 24 Sep 2026 | 84.0% | 8,188 |
| 17 Sep 2026 | 84.6% | 8,243 |
| 10 Sep 2026 | 85.2% | 8,307 |
| 3 Sep 2026 | 75.9% | 7,399 |
| 27 Aug 2026 | 71.3% | 6,949 |
| 20 Aug 2026 | 51.2% | 4,990 |
| 13 Aug 2026 | 44.1% | 4,294 |

