Reservoir · Gujarat · India · CWC · UNKNOWN region
Hathmati
Hathmati Dam
46.4% full
Gross capacity
9.0 TMC (256 MCM)
Live capacity
8.4 TMC (239 MCM)
River
Hathmati
Basin
West Flowing
Primary use
irrigation
Reported
October 29, 2026
Capacity in TMC
Hathmati Dam has a gross capacity of 9.0 TMC (256 MCM), of which 8.4 TMC (239 MCM) is live storage; it is currently at 46.4% full, holding 2.5 TMC (71 MCM).
- Gross capacity
- 9.0 TMC (256 MCM)
- Live capacity
- 8.4 TMC (239 MCM)
- Current storage
- 2.5 TMC (71 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
46.4%vs 7 days ago
-1.0 pplosing
vs 1 year ago
-51.0 ppyear-over-year
7-day trend
↓falling
Drought context
India drought →Storage vs October average
67%of normal
46.4% now · 69.0% average (4 yrs)
Rainfall, last 3 months
Near normal
SPI-3 −0.45 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 29 Oct 2026 | 46.4% | 71 |
| 22 Oct 2026 | 47.4% | 72 |
| 15 Oct 2026 | 60.4% | 92 |
| 8 Oct 2026 | 60.9% | 93 |
| 1 Oct 2026 | 61.9% | 95 |
| 24 Sep 2026 | 61.9% | 95 |
| 17 Sep 2026 | 60.4% | 92 |
| 10 Sep 2026 | 46.9% | 72 |
| 3 Sep 2026 | 60.4% | 92 |
| 27 Aug 2026 | 61.5% | 94 |
| 20 Aug 2026 | 61.5% | 94 |
| 13 Aug 2026 | 61.5% | 94 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | GUJARAT |
| Coordinates | 23.533°N, 73.117°E |
About this reservoir
Data source
official
Storage data: CWC. CWC region: UNKNOWN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 23.533°N, 73.117°E · Open in Google Maps
About Hathmati Dam
As of October 29, 2026, Hathmati Dam has a published fill of 46.4%, holding 2.5 TMC (71 MCM). Gross capacity is 9.0 TMC (256 MCM). At this level the reservoir is within its normal operating range. Of that total, 8.4 TMC (239 MCM) is live storage.
Over the most recent week on record the fill level has fallen by 1.0 percentage points, and it is 51.0 points below its level on the same date a year earlier.
Across the readings we hold for Hathmati Dam — 172 data points between June 8, 2023 and October 29, 2026 — the level has ranged from a low of 15.0% (June 27, 2024) to a high of 97.4% (August 28, 2025). On average the reservoir is fullest around November and at its lowest around June.
It is operated by GUJARAT primarily for irrigation. It lies within the West Flowing basin at 23.533°N, 73.117°E.