Reservoir · Jharkhand · India · CWC · EASTERN region
Getalsud
Getalsud Dam
39.5% full
Total capacity
226 hm³
Live storage
215 hm³
River
Subarnarekha
Basin
Subarnarekha
Primary use
water supply
Operator
JH
Coordinates
23.417°N, 85.733°E
Last updated
2026-06-04
Current fill
39.5%vs 7 days ago
-1.7%losing
vs 1 year ago
-5.0%year-over-year
7-day trend
↓falling
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: EASTERN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 23.417, 85.733 · Open in Google Maps
About Getalsud Dam
As of June 4, 2026, Getalsud Dam is filled to 39.5% of its total capacity, holding roughly 86 hm³ of water out of a maximum 226 hm³. At this level the reservoir is low. Of that total, about 215 hm³ is usable (live) storage.
Over the most recent week on record the fill level has fallen by 1.7 percentage points, and it is 5.0 points below its level on the same date a year earlier.
Across the readings we hold for Getalsud Dam — 59 data points between April 3, 2025 and June 4, 2026 — the level has ranged from a low of 39.5% (June 4, 2026) to a high of 92.2% (October 16, 2025). On average the reservoir is fullest around October and at its lowest around May.
It is operated by JH primarily for water supply. It lies within the Subarnarekha basin at 23.417°N, 85.733°E.
Key facts
- Current fill level
- 39.5%
- Water stored
- 86 hm³
- Total capacity
- 226 hm³
- Usable capacity
- 215 hm³
- 7-day change
- ▼ 1.7 pts
- Year-on-year
- ▼ 5.0 pts
- Primary use
- Water supply
- River
- Subarnarekha
- River basin
- Subarnarekha
- Operator
- JH
- Coordinates
- 23.417°N, 85.733°E
- Last updated
- June 4, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 4 Jun 2026 | 39.5% | 86 |
| 29 May 2026 | 41.1% | 90 |
| 21 May 2026 | 45.9% | 100 |
| 14 May 2026 | 58.8% | 128 |
| 7 May 2026 | 61.0% | 133 |
| 30 Apr 2026 | 60.5% | 132 |
| 23 Apr 2026 | 65.6% | 143 |
| 16 Apr 2026 | 74.1% | 162 |
| 9 Apr 2026 | 80.5% | 175 |
| 2 Apr 2026 | 80.9% | 176 |
| 27 Mar 2026 | 82.1% | 179 |
| 19 Mar 2026 | 82.7% | 180 |
Frequently asked questions
What is the current water level of Getalsud Dam?
As of June 4, 2026, Getalsud Dam is at 39.5% of its capacity, holding approximately 86 hm³ of water, according to CWC data.
Is Getalsud Dam reservoir full?
No. As of June 4, 2026, Getalsud Dam is low at 39.5% of its capacity, so it is not full.
Is the water level at Getalsud Dam rising or falling?
The level at Getalsud Dam is falling — it dropped 1.7 percentage points over the latest week on record.
How much water can Getalsud Dam hold?
Getalsud Dam has a total capacity of 226 hm³, of which about 215 hm³ is usable storage.
Where is Getalsud Dam reservoir located?
Getalsud Dam is located in Jharkhand, India, within the Subarnarekha basin (coordinates 23.417°N, 85.733°E).
What is Getalsud Dam used for?
Getalsud Dam is used primarily for water supply, and is managed by JH.

