Reservoir · Jharkhand · India · CWC · EASTERN region
Getalsud
Getalsud Dam
57.0% full
Total capacity
226 hm³
Live storage
215 hm³
River
Subarnarekha
Basin
Subarnarekha
Primary use
water supply
Operator
JH
Coordinates
23.417°N, 85.733°E
Last updated
2026-07-30
Current fill
57.0%vs 7 days ago
+2.4%gaining
vs 1 year ago
-24.7%year-over-year
7-day trend
↑rising
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: EASTERN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 23.417, 85.733 · Open in Google Maps
About Getalsud Dam
As of July 30, 2026, Getalsud Dam is filled to 57.0% of its total capacity, holding roughly 124 hm³ of water out of a maximum 226 hm³. At this level the reservoir is within its normal operating range. Of that total, about 215 hm³ is usable (live) storage.
Over the most recent week on record the fill level has risen by 2.4 percentage points, and it is 24.7 points below its level on the same date a year earlier.
Across the readings we hold for Getalsud Dam — 66 data points between April 3, 2025 and July 30, 2026 — the level has ranged from a low of 31.7% (June 25, 2026) to a high of 92.2% (October 16, 2025). On average the reservoir is fullest around October and at its lowest around May.
It is operated by JH primarily for water supply. It lies within the Subarnarekha basin at 23.417°N, 85.733°E.
Key facts
- Current fill level
- 57.0%
- Water stored
- 124 hm³
- Total capacity
- 226 hm³
- Usable capacity
- 215 hm³
- 7-day change
- ▲ 2.4 pts
- Year-on-year
- ▼ 24.7 pts
- Primary use
- Water supply
- River
- Subarnarekha
- River basin
- Subarnarekha
- Operator
- JH
- Coordinates
- 23.417°N, 85.733°E
- Last updated
- July 30, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 30 Jul 2026 | 57.0% | 124 |
| 23 Jul 2026 | 54.6% | 119 |
| 16 Jul 2026 | 45.4% | 99 |
| 9 Jul 2026 | 44.0% | 96 |
| 2 Jul 2026 | 35.8% | 78 |
| 25 Jun 2026 | 31.6% | 69 |
| 4 Jun 2026 | 39.5% | 86 |
| 31 May 2026 | 46.3% | 101 |
| 29 May 2026 | 41.1% | 90 |
| 21 May 2026 | 45.9% | 100 |
| 14 May 2026 | 58.8% | 128 |
| 7 May 2026 | 61.0% | 133 |
Frequently asked questions
What is the current water level of Getalsud Dam?
As of July 30, 2026, Getalsud Dam is at 57.0% of its capacity, holding approximately 124 hm³ of water, according to CWC data.
Is Getalsud Dam reservoir full?
No. As of July 30, 2026, Getalsud Dam is within its normal operating range at 57.0% of its capacity, so it is not full.
Is the water level at Getalsud Dam rising or falling?
The level at Getalsud Dam is rising — it gained 2.4 percentage points over the latest week on record.
How much water can Getalsud Dam hold?
Getalsud Dam has a total capacity of 226 hm³, of which about 215 hm³ is usable storage.
Where is Getalsud Dam reservoir located?
Getalsud Dam is located in Jharkhand, India, within the Subarnarekha basin (coordinates 23.417°N, 85.733°E).
What is Getalsud Dam used for?
Getalsud Dam is used primarily for water supply, and is managed by JH.

