← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Gajuladinne Project

59.3% of gross capacity

Gross capacity

4.5 TMC (127 MCM)

Live capacity

3.8 TMC (109 MCM)

Basin

Krishna

Operator

AP Water Resources Dept

Coordinates

15.693°N, 77.619°E

Last updated

2026-10-27

Capacity in TMC

Gajuladinne Project Dam has a gross capacity of 4.5 TMC (127 MCM), of which 3.8 TMC (109 MCM) is live storage; it is currently at 59.3% of gross capacity, holding 2.7 TMC (76 MCM) (69.7% of live capacity).

Gross capacity
4.5 TMC (127 MCM)
Live capacity
3.8 TMC (109 MCM)
Current storage
2.7 TMC (76 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

59.3%
Normal

vs 22 Oct 2026

-1.2 pp

losing

vs 1 year ago

N/A

Trend

↓

falling

Drought context

Rain over the last three months · 11 October 2026

Extremely dry

In the three months to 11 October 2026 the area around Gajuladinne Project had extremely little rain for the season, a shortfall seen about one year in forty. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −2.71). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.693°N, 77.619°E · Open in Google Maps

About Gajuladinne Project

As of October 27, 2026, Gajuladinne Project is filled to 59.3% of its gross capacity, holding 2.7 TMC (76 MCM) of a gross 4.5 TMC (127 MCM). At this level the reservoir is within its normal operating range. Of that total, 3.8 TMC (109 MCM) is live storage.

Since October 22, 2026 the fill level has fallen by 1.2 percentage points.

Across the readings we hold for Gajuladinne Project — 13 data points between July 2, 2026 and October 27, 2026 — the level has ranged from a low of 49.5% (September 9, 2026) to a high of 60.5% (October 22, 2026).

It is operated by AP Water Resources Dept. It lies within the Krishna basin at 15.693°N, 77.619°E.

Key facts

Current fill level
59.3% of total capacity
Water stored
2.7 TMC (76 MCM)
Total capacity
4.5 TMC (127 MCM)
Usable capacity
3.8 TMC (109 MCM)
Change since October 22, 2026
▼ 1.2 pp
River basin
Krishna
Operator
AP Water Resources Dept
Coordinates
15.693°N, 77.619°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202659.3%76
22 Oct 202660.5%77
16 Sep 202650.4%64
9 Sep 202649.5%63
2 Sep 202649.7%63
27 Aug 202651.9%66
20 Aug 202653.3%68
13 Aug 202654.0%69
4 Aug 202654.3%69
29 Jul 202653.5%68
22 Jul 202653.2%68
15 Jul 202656.1%71

Nearby reservoirs