reservoirs.earth logo
Reservoirs.EARTH
Antioquia

Reservoir · Antioquia · Colombia · XM

Troneras

51.1% full

Capacity

63.93 GWh

Energy stored

33 GWh

River

Guadalupe

Coordinates

6.756°N, 75.250°W

Last updated

2026-07-28

Current fill

51.1%
Normal

vs 7 days ago

+10.1%

gaining

vs 1 year ago

-16.8%

year-over-year

7-day trend

rising

Data source: XM — Operador del Mercado de Energía — daily useful-energy storage (VoluUtilDiarEner) and useful capacity (CapaUtilDiarEner). Colombia is a hydropower system, so storage is reported as energy (GWh), not water volume; fill % is useful energy ÷ useful capacity. Last reading: 2026-07-28.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 6.756, -75.250 · Open in Google Maps

About Troneras

As of July 28, 2026, Troneras is filled to 51.1% of its total capacity, holding roughly 33 GWh of water out of a maximum 64 GWh. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has risen by 10.1 percentage points, and it is 16.8 points below its level on the same date a year earlier.

Across the readings we hold for Troneras — 2035 data points between January 1, 2021 and July 28, 2026 — the level has ranged from a low of 2.7% (February 24, 2021) to a high of 105.0% (January 11, 2021). On average the reservoir is fullest around July and at its lowest around February.

It is operated by XM primarily for hydroelectric power. It lies within the Guadalupe basin at 6.756°N, 75.250°W.

Key facts

Current fill level
51.1%
Water stored
33 GWh
Total capacity
64 GWh
7-day change
▲ 10.1 pts
Year-on-year
▼ 16.8 pts
Primary use
Hydroelectric power
River
Guadalupe
River basin
Guadalupe
Operator
XM
Coordinates
6.756°N, 75.250°W
Last updated
July 28, 2026

Recent readings

DateFill levelVolume (GWh)
28 Jul 202651.1%33
27 Jul 202641.0%26
26 Jul 202654.2%35
25 Jul 202667.1%43
24 Jul 202664.2%41
23 Jul 202655.4%35
22 Jul 202661.0%39
21 Jul 202675.5%48
20 Jul 202689.1%57
19 Jul 202671.5%46
18 Jul 202662.0%40
17 Jul 202674.9%48

Frequently asked questions

What is the current water level of Troneras?

As of July 28, 2026, Troneras is at 51.1% of its capacity, holding approximately 33 GWh of water, according to XM — Operador del Mercado de Energía data.

Is Troneras reservoir full?

No. As of July 28, 2026, Troneras is within its normal operating range at 51.1% of its capacity, so it is not full.

Is the water level at Troneras rising or falling?

The level at Troneras is rising — it gained 10.1 percentage points over the latest week on record.

How much water can Troneras hold?

Troneras has a total capacity of 64 GWh.

Where is Troneras reservoir located?

Troneras is located in Antioquia, Colombia, within the Guadalupe basin (coordinates 6.756°N, 75.250°W).

What is Troneras used for?

Troneras is used primarily for hydroelectric power, and is managed by XM.

Nearby reservoirs

ShareXLinkedInWhatsApp