Reservoir · Santander · Colombia · XM

Topocoro (Sogamoso)

93.7% full

Capacity

1,028.72 GWh

Energy stored

964 GWh

River

Sogamoso

Reported

November 8, 2026

Current fill

93.7%
High

vs 7 days ago

+2.1 pp

gaining

vs 1 year ago

-0.6 pp

year-over-year

7-day trend

↑

rising

Drought context

Colombia drought →

Storage vs November average

100%of normal

93.7% now · 93.8% average (6 yrs)

Rainfall, last 3 months

Moderately dry

SPI-3 −1.19 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Data source: XM — Operador del Mercado de Energía — daily useful-energy storage (VoluUtilDiarEner) and useful capacity (CapaUtilDiarEner). Colombia is a hydropower system, so storage is reported as energy (GWh), not water volume; fill % is useful energy ÷ useful capacity. Last reading: 2026-11-08.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 6.770°N, 73.430°W · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Topocoro (Sogamoso)

As of November 8, 2026, Topocoro (Sogamoso) is filled to 93.7% of its total capacity, holding 964.34 GWh of water out of a maximum 1,029 GWh. At this level the reservoir is high.

Over the most recent week on record the fill level has risen by 2.1 percentage points, and it sits close to where it was a year earlier.

Across the readings we hold for Topocoro (Sogamoso) — 2138 data points between January 1, 2021 and November 8, 2026 — the level has ranged from a low of 16.1% (April 17, 2024) to a high of 101.9% (May 22, 2025). On average the reservoir is fullest around November and at its lowest around March.

It is operated by XM primarily for hydroelectric power. It lies within the Sogamoso basin at 6.770°N, 73.430°W.

Key facts

Current fill level
93.7% of total capacity
Water stored
964.34 GWh
Total capacity
1,029 GWh
7-day change
▲ 2.1 pp
Year-on-year
▼ 0.6 pp
Primary use
Hydroelectric power
River basin
Sogamoso
Operator
XM
Coordinates
6.770°N, 73.430°W
Last updated
November 8, 2026

Recent readings

DateFill levelVolume (GWh)
8 Nov 202693.7%964.34
7 Nov 202692.5%951.1
6 Nov 202690.7%932.95
5 Nov 202690.7%933.04
4 Nov 202691.4%940.44
3 Nov 202691.9%945.85
2 Nov 202692.6%952.15
1 Nov 202691.6%942.59
31 Oct 202691.2%938.3
30 Oct 202691.1%937.18
29 Oct 202690.5%930.83
28 Oct 202690.9%935.29