Reservoir · Cundinamarca · Colombia · XM
Chuza (Chingaza)
79.8% full
Capacity
971.24 GWh
Energy stored
775 GWh
River
Chuza
Reported
November 10, 2026
Current fill
79.8%vs 7 days ago
-3.0 pplosing
vs 1 year ago
-13.7 ppyear-over-year
7-day trend
↓falling
Drought context
Colombia drought →Storage vs November average
118%of normal
79.8% now · 67.6% average (6 yrs)
Rainfall, last 3 months
Extremely wet
SPI-3 +2.61 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (GWh) |
|---|---|---|
| 10 Nov 2026 | 79.8% | 775.04 |
| 9 Nov 2026 | 80.3% | 780.3 |
| 8 Nov 2026 | 80.7% | 784.08 |
| 7 Nov 2026 | 80.8% | 784.35 |
| 6 Nov 2026 | 81.2% | 789.12 |
| 5 Nov 2026 | 81.8% | 794.15 |
| 4 Nov 2026 | 82.3% | 798.96 |
| 3 Nov 2026 | 82.8% | 803.77 |
| 2 Nov 2026 | 83.3% | 808.89 |
| 1 Nov 2026 | 83.8% | 813.47 |
| 31 Oct 2026 | 84.2% | 818.11 |
| 30 Oct 2026 | 84.6% | 822.02 |
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Primary use | Hydroelectric |
| Coordinates | 4.599°N, 73.705°W |
Data source: XM — Operador del Mercado de Energía — daily useful-energy storage (VoluUtilDiarEner) and useful capacity (CapaUtilDiarEner). Colombia is a hydropower system, so storage is reported as energy (GWh), not water volume; fill % is useful energy ÷ useful capacity. Last reading: 2026-11-10.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 4.599°N, 73.705°W · Open in Google Maps
About Chuza (Chingaza)
As of November 10, 2026, Chuza (Chingaza) is filled to 79.8% of its total capacity, holding 775.04 GWh of water out of a maximum 971.24 GWh. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has fallen by 3.0 percentage points, and it is 13.7 points below its level on the same date a year earlier.
Across the readings we hold for Chuza (Chingaza) — 2140 data points between January 1, 2021 and November 10, 2026 — the level has ranged from a low of 13.4% (April 18, 2024) to a high of 101.5% (August 20, 2021). On average the reservoir is fullest around August and at its lowest around April.
It is operated by XM primarily for hydroelectric power. It lies within the Chuza basin at 4.599°N, 73.705°W.