Reservoir · Cundinamarca · Colombia · XM
Agregado Bogotá (Chingaza)
65.0% full
Capacity
4,004.18 GWh
Energy stored
2604 GWh
River
Sistema Bogotá
Reported
November 12, 2026
Current fill
65.0%vs 7 days ago
-0.3 pplosing
vs 1 year ago
+2.2 ppyear-over-year
7-day trend
→stable
Drought context
Colombia drought →Storage vs November average
107%of normal
65.0% now · 61.0% average (6 yrs)
Rainfall, last 3 months
N/A
No value on file
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (GWh) |
|---|---|---|
| 12 Nov 2026 | 65.0% | 2,604 |
| 11 Nov 2026 | 65.1% | 2,607 |
| 10 Nov 2026 | 65.2% | 2,609 |
| 9 Nov 2026 | 65.2% | 2,611 |
| 8 Nov 2026 | 65.2% | 2,611 |
| 7 Nov 2026 | 65.2% | 2,613 |
| 6 Nov 2026 | 65.3% | 2,613 |
| 5 Nov 2026 | 65.3% | 2,615 |
| 4 Nov 2026 | 65.4% | 2,618 |
| 3 Nov 2026 | 65.4% | 2,620 |
| 2 Nov 2026 | 65.5% | 2,622 |
| 1 Nov 2026 | 65.5% | 2,624 |
Technical specifications
| Primary use | Hydroelectric |
Data source: XM — Operador del Mercado de Energía — daily useful-energy storage (VoluUtilDiarEner) and useful capacity (CapaUtilDiarEner). Colombia is a hydropower system, so storage is reported as energy (GWh), not water volume; fill % is useful energy ÷ useful capacity. Last reading: 2026-11-12.
About Agregado Bogotá (Chingaza)
As of November 12, 2026, Agregado Bogotá (Chingaza) is filled to 65.0% of its total capacity, holding 2,604 GWh of water out of a maximum 4,004 GWh. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has held broadly steady (-0.3 pp), and it is 2.2 points above its level on the same date a year earlier.
Across the readings we hold for Agregado Bogotá (Chingaza) — 2142 data points between January 1, 2021 and November 12, 2026 — the level has ranged from a low of 35.4% (March 9, 2021) to a high of 69.4% (August 15, 2023). On average the reservoir is fullest around September and at its lowest around April.
It is operated by XM primarily for hydroelectric power. It lies within the Sistema Bogotá basin.