JUPIA
Mato Grosso do Sul · PARANA
Useful capacity
855.39 hm³
Reported
November 12, 2026
77.3% of useful capacity
Current fill
77.3%of useful capacity
vs 7 days ago
-9.1 pplosing
vs 1 year ago
-9.8 ppyear-over-year
7-day trend
↓falling
Drought context
Brazil drought →Storage vs November average
88%of normal
77.3% now · 88.0% average (2 yrs)
Rainfall, last 3 months
Near normal
SPI-3 +0.25 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 12 Nov 2026 | 77.3% | 660.9 |
| 11 Nov 2026 | 81.1% | 693.8 |
| 10 Nov 2026 | 83.2% | 711.9 |
| 9 Nov 2026 | 81.1% | 693.8 |
| 8 Nov 2026 | 81.8% | 699.8 |
| 7 Nov 2026 | 84.3% | 720.9 |
| 6 Nov 2026 | 87.8% | 751.1 |
| 5 Nov 2026 | 86.4% | 739 |
| 4 Nov 2026 | 86.8% | 742.1 |
| 3 Nov 2026 | 78.3% | 669.9 |
| 2 Nov 2026 | 82.2% | 702.8 |
| 1 Nov 2026 | 87.8% | 751.1 |
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Usable capacity | 855.39 hm³ |
| Operator | ONS |
| River | PARANÁ |
| Coordinates | 20.777°S, 51.633°W |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 20.777°S, 51.633°W · Open in Google Maps
About JUPIA
As of November 12, 2026, JUPIA is at 77.3% of useful capacity, holding 660.9 hm³ of 855.39 hm³. Of the 2,974 hm³ total capacity, that is 22.2%. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has fallen by 9.1 percentage points, and it is 9.8 points below its level on the same date a year earlier.
Across the readings we hold for JUPIA — 65 data points between November 12, 2025 and November 12, 2026 — the level has ranged from a low of 77.3% (November 12, 2026) to a high of 98.6% (November 28, 2025). On average the reservoir is fullest around January and at its lowest around April.
It is operated by ONS primarily for hydroelectric power. It lies within the PARANA basin at 20.777°S, 51.633°W.

