← PARAIBA DO SUL
NormalHydroelectric

JAGUARI

São Paulo · PARAIBA DO SUL

Useful capacity

795.98 hm³

Reported

November 12, 2026

79.7% of useful capacity

Current fill

79.7%

of useful capacity

Normal

vs 7 days ago

+2.1 pp

gaining

vs 1 year ago

+36.5 pp

year-over-year

7-day trend

↑

rising

Drought context

Brazil drought →

Storage vs November average

132%of normal

79.7% now · 60.5% average (2 yrs)

Rainfall, last 3 months

Extremely wet

SPI-3 +2.98 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
12 Nov 202679.7%634.1
11 Nov 202679.5%633
10 Nov 202679.4%632
9 Nov 202679.1%629.5
8 Nov 202678.7%626.5
7 Nov 202677.7%618.6
6 Nov 202677.6%618
5 Nov 202677.6%617.5
4 Nov 202677.4%616
3 Nov 202677.2%614.6
2 Nov 202676.9%612.1
1 Nov 202676.8%611.1

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity795.98 hm³
OperatorONS
RiverJAGUARI
Coordinates23.192°S, 46.021°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-12

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 23.192°S, 46.021°W · Open in Google Maps

About JAGUARI

As of November 12, 2026, JAGUARI is at 79.7% of useful capacity, holding 634.1 hm³ of 795.98 hm³. Of the 1,282 hm³ total capacity, that is 49.5%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has risen by 2.1 percentage points, and it is 36.5 points above its level on the same date a year earlier.

Across the readings we hold for JAGUARI — 65 data points between November 12, 2025 and November 12, 2026 — the level has ranged from a low of 34.9% (January 23, 2026) to a high of 79.7% (November 12, 2026). On average the reservoir is fullest around November and at its lowest around January.

It is operated by ONS primarily for hydroelectric power. It lies within the PARAIBA DO SUL basin at 23.192°S, 46.021°W.

Nearby reservoirs