← TOCANTINS
HighHydroelectric

ESTREITO

Tocantins · TOCANTINS

Useful capacity

2,390.87 hm³

Coordinates

6.589°S, 47.464°W

Operator

ONS

85.6% of useful capacity

Current fill

85.6%

of useful capacity

High

vs 7 days ago

-3.2 pp

losing

vs 1 year ago

-6.7 pp

year-over-year

7-day trend

↓

falling

Drought context

Storage vs October average

94%of normal

85.6% full on 2026-10-26, against an average of 90.7% for October across 2 years of readings (-5.1 points).

Rain over the last three months · 11 October 2026

Severely dry

In the three months to 11 October 2026 the area around ESTREITO had far less rain than normal, a shortfall seen about one year in fifteen. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.78). Rain, not storage. Brazil drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity5,299 hm³
Usable capacity2,391 hm³
Primary useHydroelectric
OperatorONS
ProvinceTocantins
River basinTOCANTINS
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-10-26

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 6.589°S, 47.464°W · Open in Google Maps

About ESTREITO

As of October 26, 2026, ESTREITO is at 85.6% of useful capacity, holding 2,047 hm³ of 2,391 hm³. Of the 5,299 hm³ total capacity, that is 38.6%. At this level the reservoir is high.

Over the most recent week on record the fill level has fallen by 3.2 percentage points, and it is 6.7 points below its level on the same date a year earlier.

Across the readings we hold for ESTREITO — 65 data points between October 26, 2025 and October 26, 2026 — the level has ranged from a low of 42.6% (February 6, 2026) to a high of 93.9% (November 14, 2025). On average the reservoir is fullest around November and at its lowest around January.

It is operated by ONS primarily for hydroelectric power. It lies within the TOCANTINS basin at 6.589°S, 47.464°W.

Key facts

Current fill level
85.6% of useful capacity
Water stored
2,047 hm³
Total capacity
5,299 hm³
Usable capacity
2,391 hm³
7-day change
▼ 3.2 pp
Year-on-year
▼ 6.7 pp
Primary use
Hydroelectric power
River basin
TOCANTINS
Operator
ONS
Coordinates
6.589°S, 47.464°W
Last updated
October 26, 2026

Recent readings

DateFill levelVolume (hm³)
26 Oct 202685.6%2,047
25 Oct 202689.2%2,134
24 Oct 202691.6%2,191
23 Oct 202691.4%2,186
22 Oct 202691.9%2,196
21 Oct 202691.0%2,175
20 Oct 202690.3%2,160
19 Oct 202688.8%2,123
18 Oct 202686.9%2,077
17 Oct 202685.6%2,047
16 Oct 202685.6%2,047
15 Oct 202686.9%2,077

Nearby reservoirs