← PARANAIBA
NormalHydroelectric

CORUMBA-4

Goiás · PARANAIBA

Useful capacity

907.16 hm³

Reported

November 15, 2026

51.7% of useful capacity

Current fill

51.7%

of useful capacity

Normal

vs 7 days ago

+3.1 pp

gaining

vs 1 year ago

-5.5 pp

year-over-year

7-day trend

↑

rising

Drought context

Brazil drought →

Storage vs November average

96%of normal

51.7% now · 53.6% average (2 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.19 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202651.7%468.9
14 Nov 202651.0%462.3
13 Nov 202650.6%459
12 Nov 202650.2%455.8
11 Nov 202649.9%452.5
10 Nov 202649.3%447.6
9 Nov 202648.6%441.1
8 Nov 202648.6%441.1
7 Nov 202649.3%447.6
6 Nov 202649.7%450.9
5 Nov 202650.2%455.8
4 Nov 202650.4%457.4

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity907.16 hm³
OperatorONS
RiverCORUMBÁ
Coordinates16.323°S, 48.188°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 16.323°S, 48.188°W · Open in Google Maps

About CORUMBA-4

As of November 15, 2026, CORUMBA-4 is at 51.7% of useful capacity, holding 468.9 hm³ of 907.16 hm³. Of the 3,791 hm³ total capacity, that is 12.4%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has risen by 3.1 percentage points, and it is 5.5 points below its level on the same date a year earlier.

Across the readings we hold for CORUMBA-4 — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 34.0% (January 2, 2026) to a high of 93.0% (June 19, 2026). On average the reservoir is fullest around June and at its lowest around December.

It is operated by ONS primarily for hydroelectric power. It lies within the PARANAIBA basin at 16.323°S, 48.188°W.

Nearby reservoirs