Reservoir · New South Wales and Victoria · Australia · BOM Water Data Online
Torrumbarry Weir
Current fill: N/A
Capacity
36.8 hm³
Volume stored
N/A
River
River Murray
Year completed
1996
Coordinates
35.945°S, 144.477°E
Not currently reporting
The most recent reading for this reservoir is from 2025-08-10, more than 45 days ago, so the current fill is shown as N/A. The history below reflects that older reading.
Current fill
N/Avs 7 days ago
N/Avs 1 year ago
N/A7-day trend
N/AData source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -35.945, 144.477 · Open in Google Maps
About Torrumbarry Weir
The dam at Torrumbarry Weir was completed in 1996. It is operated by BOM primarily for water supply. It lies within the River Murray Basin basin at 35.945°S, 144.477°E.
Key facts
- Total capacity
- 37 hm³
- Usable capacity
- 22 hm³
- Primary use
- Water supply
- River
- River Murray
- River basin
- River Murray Basin
- Year completed
- 1996
- Operator
- BOM
- Coordinates
- 35.945°S, 144.477°E
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 10 Aug 2025 | 100.0% | 37 |
| 9 Aug 2025 | 100.0% | 37 |
| 8 Aug 2025 | 100.0% | 37 |
| 17 Oct 2024 | 100.0% | 37 |
| 16 Oct 2024 | 100.0% | 37 |
| 15 Oct 2024 | 100.0% | 37 |
| 14 Oct 2024 | 100.0% | 37 |
| 13 Oct 2024 | 100.0% | 37 |
| 12 Oct 2024 | 100.0% | 37 |
| 11 Oct 2024 | 100.0% | 37 |
| 10 Oct 2024 | 100.0% | 37 |
| 9 Oct 2024 | 100.0% | 37 |

