← Tasmania

Reservoir · Tasmania · Australia · BOM Water Data Online

Pine Tier Lagoon

27.9% full

Capacity

7.4 hm³

Volume stored

2 hm³

River

Nive River

Year completed

1953

Coordinates

42.085°S, 146.485°E

Last updated

2026-10-26

Current fill

27.9%
Low

vs 7 days ago

-0.8 pp

losing

vs 1 year ago

+1.8 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

133%of normal

27.9% full on 2026-10-26, against an average of 21.0% for October across 4 years of readings (+6.9 points).

Rain over the last three months · 11 October 2026

Severely dry

In the three months to 11 October 2026 the area around Pine Tier Lagoon had far less rain than normal, a shortfall seen about one year in fifteen. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.65). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-26.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 42.085°S, 146.485°E · Open in Google Maps

About Pine Tier Lagoon

As of October 26, 2026, Pine Tier Lagoon is filled to 27.9% of its total capacity, holding 2.07 hm³ of water out of a maximum 7.4 hm³. At this level the reservoir is low. Of that total, 1.9 hm³ is usable (live) storage.

Over the most recent week on record the fill level has held broadly steady (-0.8 pp), and it is 1.8 points above its level on the same date a year earlier.

Across the readings we hold for Pine Tier Lagoon — 1087 data points between October 28, 2023 and October 26, 2026 — the level has ranged from a low of 0.0% (March 3, 2025) to a high of 47.5% (September 2, 2024). On average the reservoir is fullest around September and at its lowest around March.

The dam at Pine Tier Lagoon was completed in 1953. It is operated by BOM primarily for water supply. It lies within the Nive River Basin basin at 42.085°S, 146.485°E.

Key facts

Current fill level
27.9% of total capacity
Water stored
2.07 hm³
Total capacity
7.4 hm³
Usable capacity
1.9 hm³
7-day change
▼ 0.8 pp
Year-on-year
▲ 1.8 pp
Primary use
Water supply
River
Nive River
River basin
Nive River Basin
Year completed
1953
Operator
BOM
Coordinates
42.085°S, 146.485°E
Last updated
October 26, 2026

Recent readings

DateFill levelVolume (hm³)
26 Oct 202627.9%2.07
25 Oct 202627.8%2.06
24 Oct 202627.6%2.05
23 Oct 202627.8%2.06
22 Oct 202628.0%2.08
21 Oct 202628.2%2.1
20 Oct 202628.5%2.11
19 Oct 202628.7%2.13
18 Oct 202629.0%2.15
17 Oct 202629.3%2.17
16 Oct 202629.5%2.19
15 Oct 202629.7%2.2

Nearby reservoirs