← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Kinchant

87.8% full

Capacity

62.8 hm³

Volume stored

55 hm³

River

North Sandy Creek

Year completed

1977

Reported

November 1, 2026

Current fill

87.8%
High

vs 7 days ago

+1.9 pp

gaining

vs 1 year ago

+13.1 pp

year-over-year

7-day trend

↑

rising

Drought context

Australia drought →

Storage vs November average

119%of normal

87.8% now · 73.8% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.32 · to 11 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-01.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 21.207°S, 148.882°E · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Kinchant

As of November 1, 2026, Kinchant is filled to 87.8% of its total capacity, holding 55.11 hm³ of water out of a maximum 62.8 hm³. At this level the reservoir is high. Of that total, 62.2 hm³ is usable (live) storage.

Over the most recent week on record the fill level has risen by 1.9 percentage points, and it is 13.1 points above its level on the same date a year earlier.

Across the readings we hold for Kinchant — 1095 data points between November 3, 2023 and November 1, 2026 — the level has ranged from a low of 61.0% (December 24, 2025) to a high of 112.7% (March 29, 2025). On average the reservoir is fullest around April and at its lowest around December.

The dam at Kinchant was completed in 1977. It is operated by BOM primarily for water supply. It lies within the North Sandy Creek Basin basin at 21.207°S, 148.882°E.

Key facts

Current fill level
87.8% of total capacity
Water stored
55.11 hm³
Total capacity
62.8 hm³
Usable capacity
62.2 hm³
7-day change
▲ 1.9 pp
Year-on-year
▲ 13.1 pp
Primary use
Water supply
River
North Sandy Creek
River basin
North Sandy Creek Basin
Year completed
1977
Operator
BOM
Coordinates
21.207°S, 148.882°E
Last updated
November 1, 2026

Recent readings

DateFill levelVolume (hm³)
1 Nov 202687.8%55.11
31 Oct 202687.5%54.92
30 Oct 202687.2%54.78
29 Oct 202686.9%54.6
28 Oct 202686.5%54.32
27 Oct 202686.1%54.09
26 Oct 202686.1%54.05
25 Oct 202685.9%53.95
24 Oct 202686.0%54.03
23 Oct 202685.0%53.4
22 Oct 202684.8%53.25
21 Oct 202684.7%53.17

Nearby reservoirs