Reservoir · New South Wales · Australia · BOM Water Data Online
Glennies Creek
92.7% full
Capacity
283.4 hm³
Volume stored
263 hm³
Coordinates
32.340°S, 151.279°E
Last updated
2026-09-09
Current fill
92.7%vs 7 days ago
-0.2%losing
vs 1 year ago
-10.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -32.340, 151.279 · Open in Google Maps
About Glennies Creek
As of September 9, 2026, Glennies Creek is filled to 92.7% of its total capacity, holding roughly 263 hm³ of water out of a maximum 283 hm³. At this level the reservoir is high. Of that total, about 282 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (-0.2 pts), and it is 10.4 points below its level on the same date a year earlier.
Across the readings we hold for Glennies Creek — 1095 data points between September 11, 2023 and September 9, 2026 — the level has ranged from a low of 88.1% (April 1, 2024) to a high of 112.3% (May 21, 2025). On average the reservoir is fullest around August and at its lowest around January.
It is operated by BOM primarily for water supply.
Key facts
- Current fill level
- 92.7%
- Water stored
- 263 hm³
- Total capacity
- 283 hm³
- Usable capacity
- 282 hm³
- 7-day change
- ▼ 0.2 pts
- Year-on-year
- ▼ 10.4 pts
- Primary use
- Water supply
- Operator
- BOM
- Coordinates
- 32.340°S, 151.279°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 92.7% | 263 |
| 8 Sep 2026 | 92.8% | 263 |
| 7 Sep 2026 | 92.8% | 263 |
| 6 Sep 2026 | 92.8% | 263 |
| 5 Sep 2026 | 92.8% | 263 |
| 4 Sep 2026 | 92.9% | 263 |
| 3 Sep 2026 | 92.9% | 263 |
| 2 Sep 2026 | 92.9% | 263 |
| 1 Sep 2026 | 92.9% | 263 |
| 31 Aug 2026 | 93.0% | 263 |
| 30 Aug 2026 | 93.0% | 263 |
| 29 Aug 2026 | 93.0% | 264 |

