Reservoir · Victoria · Australia · BOM Water Data Online
Dartmouth
75.9% full
Capacity
3,856.2 hm³
Volume stored
2925 hm³
River
Mitta Mitta River
Year completed
1979
Coordinates
36.686°S, 147.643°E
Last updated
2026-09-08
Current fill
75.9%vs 7 days ago
+1.3%gaining
vs 1 year ago
+6.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-08.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -36.686, 147.643 · Open in Google Maps
About Dartmouth
As of September 8, 2026, Dartmouth is filled to 75.9% of its total capacity, holding roughly 2,925 hm³ of water out of a maximum 3,856 hm³. At this level the reservoir is within its normal operating range. Of that total, about 3,785 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+1.3 pts), and it is 6.4 points above its level on the same date a year earlier.
Across the readings we hold for Dartmouth — 990 data points between October 4, 2023 and September 8, 2026 — the level has ranged from a low of 64.6% (March 17, 2026) to a high of 99.3% (October 25, 2023). On average the reservoir is fullest around December and at its lowest around June.
The dam at Dartmouth was completed in 1979. It is operated by BOM primarily for water supply. It lies within the Mitta Mitta River Basin basin at 36.686°S, 147.643°E.
Key facts
- Current fill level
- 75.9%
- Water stored
- 2,925 hm³
- Total capacity
- 3,856 hm³
- Usable capacity
- 3,785 hm³
- 7-day change
- ▲ 1.3 pts
- Year-on-year
- ▲ 6.4 pts
- Primary use
- Water supply
- River
- Mitta Mitta River
- River basin
- Mitta Mitta River Basin
- Year completed
- 1979
- Operator
- BOM
- Coordinates
- 36.686°S, 147.643°E
- Last updated
- September 8, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Sep 2026 | 75.9% | 2,925 |
| 7 Sep 2026 | 75.7% | 2,918 |
| 6 Sep 2026 | 75.4% | 2,908 |
| 5 Sep 2026 | 75.0% | 2,894 |
| 4 Sep 2026 | 74.9% | 2,888 |
| 3 Sep 2026 | 74.8% | 2,885 |
| 2 Sep 2026 | 74.7% | 2,881 |
| 1 Sep 2026 | 74.6% | 2,877 |
| 31 Aug 2026 | 74.5% | 2,874 |
| 30 Aug 2026 | 74.4% | 2,870 |
| 29 Aug 2026 | 74.3% | 2,866 |
| 28 Aug 2026 | 74.2% | 2,861 |

