Reservoir · Queensland · Australia · BOM Water Data Online
Clare Weir
91.0% full
Capacity
15.9 hm³
Volume stored
15 hm³
River
Burdekin River
Year completed
1978
Coordinates
19.897°S, 147.226°E
Last updated
2026-09-09
Current fill
91.0%vs 7 days ago
-1.6%losing
vs 1 year ago
+1.2%year-over-year
7-day trend
↓falling
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -19.897, 147.226 · Open in Google Maps
About Clare Weir
As of September 9, 2026, Clare Weir is filled to 91.0% of its total capacity, holding roughly 15 hm³ of water out of a maximum 16 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has fallen by 1.6 percentage points, and it is 1.2 points above its level on the same date a year earlier.
Across the readings we hold for Clare Weir — 1059 data points between September 11, 2023 and September 9, 2026 — the level has ranged from a low of 58.4% (June 12, 2026) to a high of 148.2% (March 31, 2025). On average the reservoir is fullest around February and at its lowest around June.
The dam at Clare Weir was completed in 1978. It is operated by BOM primarily for water supply. It lies within the Burdekin River Basin basin at 19.897°S, 147.226°E.
Key facts
- Current fill level
- 91.0%
- Water stored
- 15 hm³
- Total capacity
- 16 hm³
- 7-day change
- ▼ 1.6 pts
- Year-on-year
- ▲ 1.2 pts
- Primary use
- Water supply
- River
- Burdekin River
- River basin
- Burdekin River Basin
- Year completed
- 1978
- Operator
- BOM
- Coordinates
- 19.897°S, 147.226°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 91.0% | 14 |
| 8 Sep 2026 | 92.1% | 15 |
| 7 Sep 2026 | 92.6% | 15 |
| 6 Sep 2026 | 92.2% | 15 |
| 5 Sep 2026 | 92.2% | 15 |
| 4 Sep 2026 | 91.7% | 15 |
| 3 Sep 2026 | 91.5% | 15 |
| 2 Sep 2026 | 92.6% | 15 |
| 1 Sep 2026 | 94.4% | 15 |
| 31 Aug 2026 | 93.9% | 15 |
| 30 Aug 2026 | 92.6% | 15 |
| 29 Aug 2026 | 91.6% | 15 |

