reservoirs.earth logo
Reservoirs.EARTH
← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Buckinbah Weir

94.6% full

Capacity

5.1 hm³

Volume stored

5 hm³

Year completed

1968

Coordinates

28.049°S, 148.745°E

Last updated

2026-10-11

Current fill

94.6%
High

vs 7 days ago

-2.7%

losing

vs 1 year ago

+0.7%

year-over-year

7-day trend

↓

falling

Drought context

Storage vs October average

98%of normal

94.6% full on 2026-10-11, against an average of 96.2% for October across 4 years of readings (-1.6 points).

Rain over the last three months · 21 September 2026

Near normal

In the three months to 21 September 2026 the area around Buckinbah Weir had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.12). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-11.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -28.049, 148.745 · Open in Google Maps

About Buckinbah Weir

As of October 11, 2026, Buckinbah Weir is filled to 94.6% of its total capacity, holding roughly 5 hm³ of water out of a maximum 5 hm³. At this level the reservoir is high. Of that total, about 4 hm³ is usable (live) storage.

Over the most recent week on record the fill level has fallen by 2.7 percentage points, and it sits close to where it was a year earlier.

Across the readings we hold for Buckinbah Weir — 1093 data points between October 13, 2023 and October 11, 2026 — the level has ranged from a low of 0.6% (November 20, 2024) to a high of 130.9% (November 17, 2024). On average the reservoir is fullest around October and at its lowest around December.

The dam at Buckinbah Weir was completed in 1968. It is operated by BOM primarily for water supply.

Key facts

Current fill level
94.6%
Water stored
5 hm³
Total capacity
5 hm³
Usable capacity
4 hm³
7-day change
▼ 2.7 pts
Year-on-year
▲ 0.7 pts
Primary use
Water supply
Year completed
1968
Operator
BOM
Coordinates
28.049°S, 148.745°E
Last updated
October 11, 2026

Recent readings

DateFill levelVolume (hm³)
11 Oct 202694.6%5
10 Oct 202694.7%5
9 Oct 202696.9%5
8 Oct 202699.3%5
7 Oct 202699.5%5
6 Oct 202699.4%5
5 Oct 202698.4%5
4 Oct 202697.3%5
3 Oct 202696.1%5
2 Oct 202696.2%5
1 Oct 202696.8%5
30 Sep 202698.0%5

Nearby reservoirs

ShareXLinkedInWhatsApp