← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Ben Anderson Barrage

95.3% full

Capacity

30.3 hm³

Volume stored

29 hm³

Year completed

1976

Reported

November 8, 2026

Current fill

95.3%
High

vs 7 days ago

+1.8 pp

gaining

vs 1 year ago

+1.2 pp

year-over-year

7-day trend

↑

rising

Drought context

Australia drought →

Storage vs November average

107%of normal

95.3% now · 88.8% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.89 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
8 Nov 202695.3%28.88
7 Nov 202697.5%29.55
6 Nov 202697.9%29.65
5 Nov 202698.7%29.92
4 Nov 2026100.3%30.39
3 Nov 202696.8%29.33
2 Nov 202695.2%28.85
1 Nov 202693.5%28.32
31 Oct 202692.1%27.9
30 Oct 202690.0%27.26
29 Oct 202693.9%28.44
28 Oct 202677.2%23.4

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity23.7 hm³
Primary useWater supply
Coordinates24.889°S, 152.260°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-08.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.889°S, 152.260°E · Open in Google Maps

About Ben Anderson Barrage

As of November 8, 2026, Ben Anderson Barrage is filled to 95.3% of its total capacity, holding 28.88 hm³ of water out of a maximum 30.3 hm³. At this level the reservoir is high. Of that total, 23.7 hm³ is usable (live) storage.

Over the most recent week on record the fill level has risen by 1.8 percentage points, and it is 1.2 points above its level on the same date a year earlier.

Across the readings we hold for Ben Anderson Barrage — 1091 data points between November 10, 2023 and November 8, 2026 — the level has ranged from a low of 54.5% (May 31, 2026) to a high of 139.4% (March 14, 2026). On average the reservoir is fullest around January and at its lowest around August.

The dam at Ben Anderson Barrage was completed in 1976. It is operated by BOM primarily for water supply. It is at 24.889°S, 152.260°E.

Nearby reservoirs