Reservoir · Queensland · Australia · BOM Water Data Online
Baroon Pocket
100.2% full
Capacity
61 hm³
Volume stored
61 hm³
River
Obi Obi Creek
Year completed
1989
Reported
November 17, 2026
Current fill
100.2%vs 7 days ago
+0.3 ppgaining
vs 1 year ago
+14.2 ppyear-over-year
7-day trend
→stable
Drought context
Australia drought →Storage vs November average
109%of normal
100.2% now · 91.6% average (4 yrs)
Rainfall, last 3 months
Near normal
SPI-3 +0.84 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 17 Nov 2026 | 100.2% | 61.095 |
| 13 Nov 2026 | 99.8% | 60.906 |
| 11 Nov 2026 | 99.9% | 60.94 |
| 10 Nov 2026 | 99.9% | 60.96 |
| 9 Nov 2026 | 100.0% | 61 |
| 8 Nov 2026 | 100.1% | 61.07 |
| 7 Nov 2026 | 100.1% | 61.05 |
| 6 Nov 2026 | 100.1% | 61.06 |
| 5 Nov 2026 | 100.2% | 61.14 |
| 4 Nov 2026 | 100.3% | 61.19 |
| 3 Nov 2026 | 100.4% | 61.23 |
| 2 Nov 2026 | 100.4% | 61.27 |
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Primary use | Water supply |
| River basin | Obi Obi Creek Basin |
| Coordinates | 26.710°S, 152.872°E |
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-17.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 26.710°S, 152.872°E · Open in Google Maps
About Baroon Pocket
As of November 17, 2026, Baroon Pocket is filled to 100.2% of its total capacity, holding 61.095 hm³ of water out of a maximum 61 hm³. At this level the reservoir is effectively full.
Over the most recent week on record the fill level has held broadly steady (+0.3 pp), and it is 14.2 points above its level on the same date a year earlier.
Across the readings we hold for Baroon Pocket — 927 data points between November 13, 2023 and November 17, 2026 — the level has ranged from a low of 60.0% (December 15, 2023) to a high of 110.7% (March 10, 2025). On average the reservoir is fullest around April and at its lowest around December.
The dam at Baroon Pocket was completed in 1989. It is operated by Seqwater primarily for water supply. It lies within the Obi Obi Creek Basin basin at 26.710°S, 152.872°E.

