Reservoir · Western Australia · Australia · BOM Water Data Online
Harding
82.2% full
Capacity
63.8 hm³
Volume stored
52 hm³
River
Harding River
Year completed
1985
Coordinates
21.012°S, 117.116°E
Last updated
2026-09-06
Current fill
82.2%vs 7 days ago
-0.9%losing
vs 1 year ago
+59.9%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-06.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -21.012, 117.116 · Open in Google Maps
About Harding
As of September 6, 2026, Harding is filled to 82.2% of its total capacity, holding roughly 52 hm³ of water out of a maximum 64 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (-0.9 pts), and it is 59.9 points above its level on the same date a year earlier.
Across the readings we hold for Harding — 1093 data points between September 10, 2023 and September 6, 2026 — the level has ranged from a low of 15.8% (February 4, 2026) to a high of 105.6% (March 31, 2026). On average the reservoir is fullest around April and at its lowest around January.
The dam at Harding was completed in 1985. It is operated by BOM primarily for water supply. It lies within the Harding River Basin basin at 21.012°S, 117.116°E.
Key facts
- Current fill level
- 82.2%
- Water stored
- 52 hm³
- Total capacity
- 64 hm³
- 7-day change
- ▼ 0.9 pts
- Year-on-year
- ▲ 59.9 pts
- Primary use
- Water supply
- River
- Harding River
- River basin
- Harding River Basin
- Year completed
- 1985
- Operator
- BOM
- Coordinates
- 21.012°S, 117.116°E
- Last updated
- September 6, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 6 Sep 2026 | 82.2% | 52 |
| 5 Sep 2026 | 82.3% | 53 |
| 4 Sep 2026 | 82.5% | 53 |
| 3 Sep 2026 | 82.6% | 53 |
| 2 Sep 2026 | 82.6% | 53 |
| 1 Sep 2026 | 82.8% | 53 |
| 31 Aug 2026 | 83.0% | 53 |
| 30 Aug 2026 | 83.1% | 53 |
| 29 Aug 2026 | 83.2% | 53 |
| 28 Aug 2026 | 83.3% | 53 |
| 27 Aug 2026 | 83.5% | 53 |
| 26 Aug 2026 | 83.6% | 53 |

